Concrete Contractors of McKinney
Foundations Built to Anchor Your Investment
Commercial-grade concrete foundations that meet structural specs, pass inspections, and support decades of operations across North Texas.
McKinney Project Execution
Your building is only as strong as its foundation. Our foundation crews bring precision execution, engineering coordination, and North Texas soil expertise to every commercial concrete foundation project across McKinney, Allen, Frisco, and the Collin County corridor.
- —Commercial foundations for retail, office, industrial, and mixed-use projects
- —Post-tension slabs designed for North Texas expansive soils
- —Complete coordination with structural engineers, soils reports, and permit requirements
- —Third-party testing, cylinder breaks, and inspection sign-offs documented
- —Embedded utilities, sleeves, anchor bolts, and penetrations installed per plan
- —Laser-guided concrete placement with FF/FL floor flatness certification
North Dallas Ready
Serving developers, GCs, property managers, and ownership groups across McKinney, Allen, Anna, Blue Ridge, Carrollton, Celina, Copeville, Dallas, Fairview, Farmersville, Frisco, Garland, Josephine, Lavon, Lewisville, Little Elm, Lowry Crossing, Lucas, Melissa, Murphy, Nevada, Parker, Plano, Princeton, Prosper, Richardson, Rockwall, Rowlett, Sachse, The Colony, Van Alstyne, Weston, Westminster, Wylie.
Related Services
Capabilities
What’s Included
Soil-Specific Engineering
We work directly with geotechnical engineers to design foundations that account for McKinney's expansive clay soils, seasonal moisture changes, and load requirements.
Precision Execution
From excavation depth to rebar placement and concrete mix design, every phase is executed to structural drawings with tight tolerances and third-party testing.
Schedule Coordination
Foundation pours are sequenced with site work, utilities, and framing trades to keep your project on schedule without delays or rework.
Spread footings, continuous footings, and grade beam systems
Post-tension slab-on-grade for expansive clay soils
Pier and beam foundations with proper soil stabilization
Structural slabs with embedded utilities and penetrations
Complete coordination with geotech, structural engineers, and inspectors
Laser-guided screeds and FF/FL documentation for flatwork specs
Industries
Who We Support
- •Retail centers & big-box stores
- •Office buildings & corporate campuses
- •Industrial & logistics facilities
- •Mixed-use developments
- •Healthcare facilities
- •Municipal & education buildings
Deliverables
What You Receive
- •Foundation engineering review and soils coordination
- •Excavation, grading, and compaction verification
- •Rebar placement, inspection, and as-built documentation
- •Concrete pour schedule with testing protocols
- •Post-pour inspection reports, cylinder breaks, and FF/FL certification
- •Closeout package with warranties, lien releases, and turnover documentation
Process
How We Execute
Pre-Construction Review
Review structural drawings, soils reports, and site logistics. Coordinate with engineers, geotechs, and inspectors to confirm foundation design, schedule, and material requirements.
Excavation & Grading
Excavate to design depth, stabilize subgrade, and verify compaction. Set forms, install vapor barriers, and prepare for rebar installation per structural specs.
Rebar & Embeds
Install reinforcing steel, post-tension cables, anchor bolts, embedded utilities, and all penetrations. Third-party inspection verifies placement before concrete is ordered.
Concrete Placement
Pour concrete using laser-guided screeds for flatness. Sample cylinders, verify slump, and complete finishing operations. Document pour with photos and inspector sign-offs.
Testing & Closeout
Complete post-tension stressing, cylinder break testing, FF/FL surveys, and final inspections. Deliver closeout package with all test reports, warranties, and documentation.
FAQ
McKinney Owners Ask
Do you work with our structural engineer and geotech?
Absolutely. We coordinate directly with your engineering team to review soil reports, confirm load requirements, and ensure foundation design aligns with site conditions and building specs.
How do you handle McKinney's expansive clay soils?
North Texas expansive soils require specialized foundation design. We follow geotech recommendations for post-tension systems, proper moisture barriers, and compaction protocols to prevent settlement and heaving.
What quality controls do you use during foundation pours?
Every foundation pour includes third-party testing, slump verification, cylinder sampling, and inspector sign-offs. We provide complete documentation including test reports, pour logs, and as-built elevation surveys.
Can you handle large commercial foundation packages?
Yes. Our crews routinely execute foundation packages for 50,000+ SF retail centers, tilt-wall industrial buildings, multi-story office structures, and complex mixed-use developments across the North Dallas market.
Do you install embedded utilities and anchor systems?
We coordinate all embedded elements including utilities, sleeves, anchor bolts for structural steel, equipment pads, and floor penetrations. Everything is placed per plan and verified before concrete placement.
Service Area
North Dallas Coverage Area
We mobilize experienced crews across Collin County and the surrounding North Dallas markets. Every location receives the same project management discipline and quality control procedures.
Foundation Experts
Ready to start your foundation package?
Share your structural drawings, soils report, and project timeline. Our foundation estimators will return a detailed proposal with schedule, testing protocols, and turnkey pricing.