Concrete Contractors of McKinney
Commercial Asphalt Built for Business
Large-scale paving solutions that keep commercial properties operational during construction.
McKinney Project Execution
Deliver commercial-grade asphalt that handles heavy traffic while maintaining business operations during construction.
- —Large parking lot resurfacing and reconstruction
- —Industrial yard and loading area paving
- —Business park roadway construction
- —Commercial driveway and approach paving
North Dallas Ready
Serving developers, GCs, property managers, and ownership groups across McKinney, Allen, Anna, Blue Ridge, Carrollton, Celina, Copeville, Dallas, Fairview, Farmersville, Frisco, Garland, Josephine, Lavon, Lewisville, Little Elm, Lowry Crossing, Lucas, Melissa, Murphy, Nevada, Parker, Plano, Princeton, Prosper, Richardson, Rockwall, Rowlett, Sachse, The Colony, Van Alstyne, Weston, Westminster, Wylie.
Related Services
Large-scale commercial asphalt paving across McKinney serves business parks, industrial facilities, and retail centers where cost-effective pavement solutions meet heavy traffic demands. Our asphalt division executes parking lots exceeding 100,000 square feet, circulation drives, and industrial yards with equipment capable of efficient large-area production.
Commercial asphalt projects require coordination with civil engineers on drainage, grading, and utility integration. We manage these relationships directly with property owners, coordinating design elements during preconstruction to prevent delays during construction.
Business continuity considerations shape commercial paving execution. Night pours, phased construction, and temporary access routes maintain operations while crews execute earthwork, paving, and striping operations.
Why Choose Us
- ✓Large-scale paving capacity for commercial and industrial projects
- ✓Phased construction maintaining business operations
- ✓Complete site coordination including drainage and utilities
- ✓Night and weekend paving available for occupied properties
- ✓Turnkey service from excavation through striping
Capabilities
What’s Included
Heavy-Duty Construction
Thick lifts and engineered mixes withstand commercial truck traffic and equipment.
Business Continuity
Night work and phased approaches keep businesses open during paving projects.
Quality Assurance
Density testing, compaction verification, and warranty-backed installations.
Large parking lot construction and resurfacing
Business park and industrial yard paving
Phased installations to minimize business disruption
Industries
Who We Support
- •Retail centers
- •Business parks
- •Industrial facilities
- •Distribution centers
- •Corporate campuses
Deliverables
What You Receive
- •Traffic control and phasing plans
- •Material specifications and mix designs
- •Quality testing reports
- •Warranty documentation
Process
How We Execute
Scope Alignment
Review drawings, soils, and project goals to align budget and schedule.
Preconstruction
Finalize submittals, permits, and mobilization logistics.
Execution
Superintendents manage crews, QA, and inspections to hit milestones.
Closeout
Punch list, documentation, warranties, and turnover ensure a clean finish.
FAQ
Common Questions
What size commercial parking lots can you pave?
Our equipment and crew capacity handles parking lots from 20,000 to 500,000+ square feet. Larger projects benefit from our production efficiency and quality control systems.
How do you maintain business operations during paving?
We develop phased construction plans maintaining parking capacity, customer access, and delivery routes throughout construction. Night and weekend work is available when daytime construction creates unacceptable impacts.
What's included in turnkey asphalt paving?
Turnkey paving includes excavation, drainage installation, base course placement, asphalt paving, striping, and ADA compliance coordination—complete service from dirt to finished parking lot.
Can you coordinate with civil engineers on site design?
Yes. We work with civil engineers during design to optimize grading, drainage, and utility locations that affect paving construction and project costs.
How long before parking lots can be used after paving?
Light traffic is typically permitted once asphalt cools to ambient temperature, usually 24-48 hours. Heavy delivery trucks should wait 48-72 hours for proper pavement curing.
Service Area
North Dallas Coverage Area
We mobilize experienced crews across Collin County and the surrounding North Dallas markets. Every location receives the same project management discipline and quality control procedures.
What's Included
Service Inclusions
Site excavation and earthwork
Drainage structure installation
Aggregate base placement and compaction
Prime coat and tack coat application
Hot mix asphalt placement and compaction
Curb and gutter construction
ADA ramp and accessible route installation
Striping and pavement marking coordination
Representative example of project scope we handle
Industrial Facility Paving
Location
Highway 380 Corridor, McKinney TX
Scope
185,000 SF industrial yard paving with heavy-duty specifications for truck traffic
Client Situation
Facility owner required industrial-grade paving completing before tenant operations began
Our Approach
Coordinated site work with building construction, specified heavy-duty asphalt mix and thickness, completed paving ahead of schedule enabling early tenant access
Outcome
Industrial yard completed early, enabling tenant to begin operations ahead of schedule
Contact us to discuss your commercial asphalt paving project
Commercial Paving
Need commercial asphalt?
Send site plans or photos—we'll deliver comprehensive paving proposals with phasing options.